Skip to main content
Indoor basketball court with purple accents and spectator seating.

Alexandria Central School District

The most recent project at Alexandria Central School District includes the demolition of the existing gymnasium to make room for the construction of a new, larger gymnasium which features a second story running track. The existing gymnasium was not regulation size, and its 1950’s era equipment was well beyond its useful life. This new facility includes a regulation size basketball court, 2 small basketball courts, multiple volleyball courts, batting cages, seating for 500+ patrons, and utilizes modern technology. Adjacent to the gymnasium is a multi-purpose room, which was renovated into a concession area which can serve both interior and exterior events. New restroom facilities, a storage area, and a universal locker and changing room are also provided within this space. Other renovations include reconfiguring the girls’ locker room to provide a stair up to the running track, a new coaches office, as well as site and drainage improvements. Architects at BCA designed this gymnasium, and our in-house Mechanical, Electrical, Plumbing, and Structural Engineers designed the respective systems. This $6.4m project was completed at the end of 2023.

Skaneateles Central School District

BCA Architects & Engineers has been working with Skaneateles Central School District since 2004 and designed a $10,000,000 Additions and Reconstruction Project school. The most recent project work included converting the original bus garage into district offices, improvements to the athletic stadium which included an artificial turf field and reconstructed synthetic track, envelope enhancements including roof replacements, masonry restoration and infill, and windows and door replacements, and projects dealt with hazardous materials removal, mechanical systems upgrades, and technology and security systems installations. The total value of the projects to date is $34,800,000.

Schroon Lake Central School District

BCA Architects & Engineers has been working with Schroon Lake Central School District since 2002. The most recent project work included a reconstruction of the former gymnasium into the new auditorium, the classroom (overbuild) addition, the gymnasium addition, installation of a elevator for wheelchair accessibility, toilet room upgrades, masonry restoration, plumbing, mechanical and electrical upgrades, data and communication upgrades and fire alarm replacement in the Main Building. The total value of the projects to date is $14,450,000.

Plattsburgh City School District

BCA Architects & Engineers has been working with Plattsburgh City School District since 1999. The most recent project work included a locker room reconstruction at the High School, a cafeteria addition at Oak Street Elementary School, curtain walls were replaced, the pool was completely renovated with new ceilings, lighting, regrout of ceramic tile at the Stafford Middle School, windows were replaced and a new parking area was created at Momot Elementary. All sites included hazardous material abatement, roofing replacement, kitchen upgrades, fire and security upgrades and improvements to mechanical, plumbing and electrical systems. The total value of the projects to date is $30,000,000.

Ogdensburg City School District

BCA Architects & Engineers has been working with Ogdensburg City School District since 1998. The most recent project work includes restoration of the swimming pool, reconstruction of the main entrances, construction of handicapped accessible bathrooms, window replacements, mechanical upgrades, roof replacement, fire alarm upgrades, flooring replacement, masonry rehabilitation, consolidation of the elementary schools by closing two buildings and constructing multiple classroom primary additions. The athletic fields were reorganized with new ball fields, all-weather running track, a concession building, replacement of underdrain and irrigation systems, the construction of a synthetic multi-sports turf field. Other work included the enlargement and modernization of the auditorium and the gymnasium, swimming pool, locker rooms, nurses office, home economics, band, art, business labs, and choral rooms were all renovated to current standards, the boilers and solar panel systems were replaced, and the security and fire alarm systems were improved. The total value of the projects to date is $58,850,000.

General Brown Central School District

BCA Architects & Engineers has been working with General Brown Central School District since 1994. The most recent project work included District-Wide additions/reconstruction, gymnasium addition, district office reconstruction, artificial turf field installation, roof replacements, masonry rehabilitation, lighting replacement, security upgrades, and a Smart Schools Bond. The total value of the projects to date is $22,392,685.