Alexandria Central School District
Capital Project
Location: Alexandria Bay, New York
The most recent project at Alexandria Central School District includes the demolition of the existing gymnasium to make room for the construction of a new, larger gymnasium which features a second story running track. The existing gymnasium was not regulation size, and its 1950’s era equipment was well beyond its useful life. This new facility includes a regulation size basketball court, 2 small basketball courts, multiple volleyball courts, batting cages, seating for 500+ patrons, and utilizes modern technology. Adjacent to the gymnasium is a multi-purpose room, which was renovated into a concession area which can serve both interior and exterior events. New restroom facilities, a storage area, and a universal locker and changing room are also provided within this space. Other renovations include reconfiguring the girls’ locker room to provide a stair up to the running track, a new coaches office, as well as site and drainage improvements. Architects at BCA designed this gymnasium, and our in-house Mechanical, Electrical, Plumbing, and Structural Engineers designed the respective systems. This $6.4m project was completed at the end of 2023.
Project Photos
Click to view the Full Image